|

|
|
BDO
BINDER AUDIT FIRM
|
|
Project
covers the commissioning of Human Resource
Management System and includes Smart Card
Door Access System and Time Attendance
System for 500 staffs in a building of 14
floors. |
|
|

|
|
INTEL
(PENANG)
|
|
Supply
of 6 lanes entrance management system using
barcode scanner. |
|
|
|
|
LEFORM SDN
BHD
|
|
Project covers
the commissioning of Door Access and
Attendance System for their office staff.
|
|
|

|
|
MAYFIRST
GOLD SDN BHD
|
|
Project covers
the commissioning of Door Access and
Attendance System for their office staff.
|
|
|

|
|
MISC
BERHAD
|
|
Project covers
the commissioning of Door Access and
Attendance System for their office staff.
Integrate to existing car park system to
facilitate the staff to flash on the reader to
grant access to the parking lot.
|
|
|

|
|
NORTHPORT
MALAYSIA BERHAD
|
|
The
project is to provide the commissioning,
integration the Main Gate Entrance of
Northport (M) Bhd in Port Klang, Selangor. The
customer requirement is to integrate all the
Shipping / Transport Company Lorry / truck
drivers' MyKad to register at Northport (M)
Bhd main database. The drivers are able to use
their own MyKad as the entrance pass to
entering of Northport zones and areas. The
project covers
There
are two gate compound at the North Port are
equipped with this system to facilitate the
traffic flow.
|
|
|

|
|
SHAPADU
HOLDING BERHAD
|
|
Project
covers the commissioning of Door Access
System, Attendance System and Car Parking
System for 500 staff. we have integrate the
smart card reader to their existing car park
barrier for in and out lanes.
|
|
|

|
|
SOFTMY
TECHNOLOGY SDN BHD
|
|
Project
covers the commissioning of Door Access
System, Attendance System , Car Parking System
and full height gate for the pedestrian to
grant access to the hostel. This hostel is
equipped with this access security to ensure
only valid resident can grant the right access
to this building area.
|
|
|

|
|
TECHNIP
GEOPRODUCTION (M) SDN BHD
|
|
Project
covers to replace the current poor support
Smart Card vendor. The project has to be use
back the current customer existing hardware
structure and for the commissioning,
installing of:
- 7 units Lobby Turnstile Entrance Access
System integrate with Smart Card reader
- Cover three buildings which are 100meter
away each, around 100 doors of card reader
accessories integration , all the data
centralized to the main HQ via the network
connectivity
- Full building Security Access System
- Security Center Monitoring System
- Visitor Management System
- Integrate with around 1800 Smart card to
their existing system
|
|
|

|
|
TR
HAMZAH & YEANG SDN BHD
|
|
Project covers the commissioning of Door
Access and Attendance System for their office
staff.
|
|